Posts

Innovation Day

We were pleased to be invited at the GRTgaz symposium of innovations.

An event where the equipment provided by FCE for the installation of a rapid by-pass construction were presented.

The main goal was to find a rapid solution in order to overcome ground configuration and security issues.

 

To achieve this, we substituted flanged piping for unionised piping in order to reduce the assembly time (1 day reduced to 2 hours).

The use of swivel joints also allowed to solve the configuration issues of the lines during the installation.

 

The FCE equipment was among the most attractive innovation all day long. The GRT-Gaz operation management has expressed his intention to generalize the use of the FCE unions and swivels in all territories and for all operations where a temporary piping is needed.

20181010_095106